Projects

ABC’s effective Project & Risk Management System ensures the successful completion of the projects, through the proper planning, scheduling, monitoring and control of the activities right from signing of contract till the final handing over of the project. Each project is governed by individual teams for best project coordination with clients and suppliers and efficient execution. This unique strategy made ABC capable of handling multiple projects successfully within the target date and cost which created prestigious status with our main Customer Saudi Electricity Company. Our project execution has been recognized by Saudi Aramco and we have been awarded as the “Best Substation Contractor”.

ABC undertake complicated projects even with unfavorable terrain. Auguring in dense soil and anchoring in hard rock, lifting and erection of huge towers, high masts, stringing of heavy conductors, laying high voltage cables, testing of cables and measurement of illumination.

SNNAME OF CLIENTPROJECT NAMEVALUE SARLOCATIONAWARDED YEAR
1DAR ALARKANConstruction of 132/13.8KV S/S 8107 at Salbokh Area Riyadh69,774,979Riyadh2008
2DAR ALARKANConstruction of 132/13.8KV S/S 8105 at Salbokh Area Riyadh69,279,982Riyadh2008
3MINISTRY OF HIGHER EDUCATIONConstruction of 132/13.8KV S/S 8715 at Riyadh Area67,672,868Riyadh2010
4NG-SAConstruction of 132/13.8KV S/S at Qurayyat65,732,000Qurayat2010
5RICConstruction of 132/13.8KV S/S 8086 at Riyadh Area56,985,000Riyadh2010
6NG-SAConstruction of 132/13.8KV S/S 8142 at Al-Khalij II51,019,863Riyadh2010
7NG-SAConstruction of 132/13.8KV S/S 814650,702,012Riyadh2010
8NG-SAConstruction of 132/13.8KV S/S 8150 at Al-Qudus50,738,185Riyadh2010
9NG-SAConstruction of 132/13.8KV S/S 8153 at Al-Sulay55,861,940Riyadh2010
10NG-SAConstruction of 132/13.8KV S/S 8145 at Nahdaha Area52,399,000Riyadh2010
11NG-SA132KV NETWORK REINFORCEMENT ASSOCIATED WITH S/S 902964,488,533Qassim2011
12SECConstruction of New Oraija 380/132/13.8kV BSP (9016)247,460,000Riyadh2011
13NG-SAConstruction of 115/13.8KV Qatif Substation # 284,240,000Qatif2012
14NG-SAINSTALLATION OF 115KV UNDERGROUND CABLES FROM DAHRAN SOUTH 380/115KV BSP TO AL-MARKAZ 115/13.8K S/S117,045,917Dammam2012
15SECCONSTRUCTION OF WADI AL-DAWASIR 380/132/13.8kV BSP337,950,000Wadi Al-Dawasir2013
16NG-SAConstruction of Al-Warood 132/13.8kV, S/s 816474,445,070Riyadh2013
17NG-SAConstruction of AL Naseem South west 132/13.8kV, S/s 820070,329,503Riyadh2013
18NG-SAConstruction of Al-Ghornattah 132/13.8kV S/s 820268,409,056Riyadh2013
19NG-SAConstruction of Al-Olayyah-II 132/13.8kV, S/s 820465,196,371Riyadh2013
20NG-SACONSTRUCTION OF UMM AL-HAMAM 132/13.8KV S/s 817584,795,065Riyadh2013
21NG-SACONSTRUCTION OF AL-SHIFA 132/13.8KV S/s 820783,359,759Riyadh2013
22NG-SAINSTALLATION OF TRANSFORMER AT 132/33kV S/s (9029)40,265,176Qassim2013
23RCJYConstruction of 380/115/33kV S/s at RIC 402,231,695Ras Al-Khair2013
24SECCONSTRUCTION OF 380/132/13.8kV BSP# 9034 IRRQAA448,777,000Riyadh2013
25MINISTRY OF HEALTHRenovation of King Fahd Hospital at Al-Madinah116,384,108Madinah2013
26NG-SACONSTRUCTION OF AL-MOONSIYAH 132/13.8kV SUBSTATION # 825779,500,000Riyadh2014
27NG-SAConnection of 132kv DC OHTL for RESIDENTIAL S/S AND PHOSPHATE S/S AT WAAD AL-SHAMAAL154,585,427Waad Al-Shammal2014
28NG-SAConnection of Juba BSP SS 9701 with 132kV Networks in Wadi Al Dawasir80,293,103Wadi Al-Dawasir2014
29NG-SAConstruction of 110KV OHTL to connect Central Yanbu-3 /AL-Muajjiz Terminal in Yanbu35,480,000Yanbu2014
30NG-SAConstruction of Al-Bejadya 132/33KV 8608 SS81,000,000Al-Bejadya2014
31NG-SAConstruction of Afif 132/13.8KV 8604 SS74,000,000Afif2014
32NG-SAConstruction of Quwaiah 132/33/13.8KV 8514 SS and 132KV DC OHTL from looping point of existing OHL 8077SS-9063SS98,300,000Quwaiah2014
33NG-SAConstruction of Thadeq 132/33KV 8524 SS71,500,000Thadeq2014
34NG-SACONSTRUCTION OF AL-MALAZ 132/13.8kV SUBSTATION # 818271,700,000Riyadh2014
35NG-SACONSTRUCTION OF AL DILLAM 132/33/13.8kV SUBSTATION# 871892,690,000Riyadh2014
36NG-SAConstruction of 132/13.8KV SS 8841 - Rawaq84,500,000Rawaq2014
37NG-SAConstruction of 132/33KV SS 8525 Artawayah84,000,000Artawayah2014
38NG-SAConstruction of 132/33/13.8KV SS 8925 Al Qaid93,500,000Al Qaid2014
39NG-SAConstruction of 132/13.8KV SS 8845 BURAYDAH CENTER -277,000,000BURAYDAH2014
40NG-SAReinforcement of 132 / 33 kV Substations # 8810 & 8814 in Qassim Area119,900,000Qassim2014
41NG-SAReinforcement for addition of 3rd Transformer (132/13.8kV) in Al Kharj Colleges Complex S/S 871535,400,000Riyadh2015
42NWCCONSTRUCTION OF NEW 132/13.8 KV SS 8063 AL-HAIER AREA & CONSTRUCTION OF 132KV OVERHEAD TRANSMISSION LINE FROM SS 9023(PP10) TO NEW SS 8063115,000,000Haier2015
43NG-SACONSTRUCTION OF INDUSTRIAL 132/13.8kV SUBSTATION # 8254 IN RIYADH80,500,000Riyadh2015
44NG-SACONSTRUCTION OF AL-NAHDAH 132/13.8kV SUBSTATION # 818576,300,000Riyadh2015
45NG-SACONSTRUCTION OF AL-MAAZILIAH 132/13.8kV SUBSTATION # 822876,700,000Riyadh2015
46NG-SAINSTALLATION OF AMI SYSTEM AT SEVERAL SUBSTATIONS OF CENTRAL OPERATING AREA 36,100,000Central Area2015
47NG-SACONSTRUCTION OF DURMA, 132/33kV & 132/13.8 kV SUBSTATION # 8511 IN RURAL RIYADH AREA114,543,000Riyadh2015
48NG-SACONSTRUCTION OF INDUSTRAIL AREA, 132/13.8kV SUBSTATION # 8236 IN RIYDAH AREA84,223,000Riyadh2015
49NG-SAREINFORCEMENT OF AL-MUZAHMIAH COLLEGES COMPLEX, 132/13.8kV SUBSTATION # 852220,420,000Riyadh2015
50NG-SACONSTRUCTION OF AL-BADI, 132/33kV SUBSTATION # 8767 IN KHARJ AREA AND 132kV UNDERGROUND CABLE CIRCUIT IN HAIL AREA ( PART-I & II)77,157,000Riyadh2015
51NG-SAINSTALLATION OF 132/13.8kV TRANSFORMERS AND ASSOCIATED EQUIPMENT AT EXISTING BSP SUBSTATION#9037 IN AL-DAWADMI AREA53,457,000Riyadh2015
52RCJYEPC of Expansion of Jubail -2 Substation-4 (115/34.5KV)52,150,000Jubail2016
53SAUDI ARAMCOCONSTRUCTION OF 115 KV DOUBLE CIRCUIT OVERHEAD TRANSMISSION LINES, POWER CONDUCTORS AND UNDERGROUND CABLES IN FADHILI AREA39,000,000Fadhili2016
54NG-SAREPLACEMENT OF EXISTING 132kv DC OHL 8015-8104 & DIVERSION OF EXISTING UG CABLE CIRCUIT 8015-8049B AT NATIONAL GUARD AREA30,046,436Riyadh2017
55NG-SACONSTRUCTION OF THREE DC 132KV OHT LINES FOR NEW AL TAWDIHIYA-2 S/S 8725 IN AL KHARJ AREA61,933,222Riyadh2017